logo
logo

I: Purchase of Raw Material (Scrap and Chemicals)
A separate department continuously keeps in touch with local and international markets to have a comprehensive picture of basic raw materials (scrap and chemicals). Once the demand is raised, inquiries from different companies in both local and international markets are collected for the most competitive rates for the purchase of products.

A separate department continuously keeps in touch with local and international markets to have a comprehensive picture of basic raw materials (scrap and chemicals). Once the demand is raised, inquiries from different companies in both local and international markets are collected for the most competitive rates for the purchase of products.

After the delivery of material it is analyzed in a laboratory for a set standard of quality after which it is approved for consumption.

  • unit-1
  • unit-2

II: Furnace Melting Process
The melting process is done according to the demand or at regular grades. Both the Arc and Induction furnaces mostly make low carbon steel grades like ASTM A36 and as the temperature reaches to the desired degree, molten steel of Arc furnace is cast in moulds made of pig iron, where as the molten steel from the induction furnace is taken to Continuous Casting plant.

  • furnance-1
  • furnance-2

ADDRESS

45 Peco Road, Badami Bagh
Lahore - Pakistan

Phone Number:
+92-42-37280419, 37280424

Fax Number: +92-42-37281181

Website: www.newshalimar.com

Email: info@newshalimar.com